The work is still progressing nicely at Project Hillside. The Lands at Hillside Farms are buzzing with traffic and causing a lot more traffic in front of the house with people "escaping for a country drive" which leads me to believe I should really open up my lemonade stand in front of the house. While that project hasn't formalized, the fence has been installed and the concrete walkway with drains are installed. The fence installation (click here) turned out lovely. On top of that, I went ahead and ripped up a good amount of concrete and installed the drainage pipe (click here). We are excited for the hot tub and the continued progress on the backyard. Stay tuned!


